Geobulletin alpha

News from the Geoblogosphere feed

by Stratigraphy.net
New from Snet: Lithologs, a new tool to create lithological/sedimentological logs online..

Nicholson Awarded Secant Pile Contract for St. Louis CSO Facility

Source info:

Author:
Date: 2016-08-29 07:02:03
Blog: GeoPrac.net
URL: http://www.geoprac.net/geonews-mainmenu-63/64-project-related/1735-nicholson-awarded-secant-pile-contract-for-st-louis-cso-facility

Summary:

Nicholson Construction was recently awarded a secant pile wall contract for the Maline Creek combined sewer overflow (CSO) project in St Louis, Missouri. Their scope of work will include 78 880-mm (~3-ft) piles to depths of 40 to 50 feet, 114 880-mm secant piles to approximately the same depth that will form a braced excavation. They will also install 4 seven foot diameter jet grout columns beneath an existing sewer to support it during excavation. [Source: More about the project at NicholsonConstruction.com. Image: Nicholson Construction]

Content analysis:

Keywords:

frontpage

Stratigraphy.net | Impressum
Ads: